No special updates are required to make WBS Schedule Pro compatible with Project 2019.

** Project 2019 behaves like Project 2016 internally which means that current versions of WBS Schedule Pro can communicate with it as if it were Project 2016. Go to the Download page for details on upgrading to the latest version. *Project 2016 support was added in October, 2015 and is only available in WBS Schedule Pro version or later.

WBS Schedule Pro integrates with the following Non-English versions of Microsoft Project: Chinese (Simplified & Traditional), Czech, Danish, Dutch, French, German, Korean, Hebrew, Italian, Japanese, Norwegian, Polish, Portuguese, Russian, Spanish & Swedish. This includes full compatibility with the Standard and Professional versions of these where applicable. WBS Schedule Pro integrates with and is fully compatible with the following versions of Microsoft Project: WBS Schedule Pro works in a Citrix environment. WBS Schedule Pro runs on all major networks. The file sizes of some of the larger projects are usually less than 1Mb. WBS Schedule Pro takes less than 25Mb of disk space when installed. If you are running Windows efficiently you have enough memory. WBS Schedule Pro requires a minimum amount of memory. Due to the fact that Microsoft has stopped supporting Windows XP and Vista, Critical Tools cannot be responsible for issues when running WBS Schedule Pro on an XP/Vista system and may not be able to help should issues arise. WBS Schedule Pro was tested on Windows XP and works with the exception of a few minor display issues.

WBS Schedule Pro is fully compatible with Windows Vista. WBS Schedule Pro was developed for Windows 7, Windows 8 and Windows 10 and is fully compatible with these versions of Windows. Compatible with Windows 7, Windows 8 and Windows 10